ASTM F2170 PDF

ASTM F formally recognizes the use of in situ probes as a means of conducting relative humidity testing. In fact, ASTM F represents a fundamental. ASTM F ASTM F RH (Relative Humidity). Testing Protocol: ASTM Abstract: Significance and Use. Moisture permeating from concrete floor slabs. Standard Test Method for Determining Relative Humidity in Concrete Floor Using in situ Probes. Apparatus – Humidity Probe and Digital Meter Accuracy ± %.

Author: Malalmaran Kajim
Country: Sudan
Language: English (Spanish)
Genre: Personal Growth
Published (Last): 27 October 2004
Pages: 108
PDF File Size: 8.28 Mb
ePub File Size: 2.93 Mb
ISBN: 520-6-45370-339-9
Downloads: 61787
Price: Free* [*Free Regsitration Required]
Uploader: Sazilkree

UPS peak season may cause delays. There is a potential for condensation to appear on the sensor during the test period, due to the high relative humidity within the concrete until the concrete has sufficiently dried. If i have an area of approx astk ft and have done the required testing for the area, and 5 fail and 3 pass does the whole area fail?

As far back as the s, laboratories at the Portland Cement Association conducted controlled tests that verified the accuracy of RH testing. After the initial reading, readings can be updated at any time desired with two conditions in mind: The only thing we recommend is that you ensure that there is a good seal between the sensor body and the concrete wall.

Map your xstm count and location. For flooring and concrete professionals, ASTM F provides the standard for using g2170 humidity RH testing when measuring moisture content in atsm slabs.

Your email address will not be published. The readings will remain high until the sensor is allowed to dry in fresh air.

September 2, at axtm We recommend placing the serial number decal which also helps track certification of each sensor on the corresponding test hole on the mapped report. The initial ASTM F for in situ RH testing was established inafter continuing research at Scandinavian universities in the s identified the exact specifications for conducting a reliably accurate RH test—placing the test probe at 40 percent depth for slabs poured on grade or 20 percent for slabs drying from both sides.

This moisture map helps the user determine where it is best to locate the sensors for F As concrete ast, moisture migrates from the bottom of the slab to the surface where it can evaporate away. F requires three test holes for the first ft 2 and, at least, one additional hole for each additional ft 2.

  BCSI B3 PDF

Section 11 of ASTM F details the requirements of each report, including test hole location, dates and times of measurements, RH reading, temperature reading, and any other conditions that might impact the RH reading see section 11 for complete reporting requirements. You consent to our cookies if you continue to use our website. These first five steps are all preparatory and should be done before any sensors or RH probes are installed.

Relative humidity RH in a concrete slab can fluctuate with environmental changes. This process requires time f210 quantifiable concrete moisture measurements to verify.

In-situ probes deepen concrete moisture measurement. By testing non-destructively per ASTM F, the inspector can get an instant and precise evaluation of the moisture conditions within 1.

June 8, at 1: Official RH test results can now be obtained after just 24 hours. While any professional must understand the exact requirements of standard F the most recent version2f170 following are 10 guidelines to help ensure that you have met the criteria laid out in ASTM F After these scientifically-validated specifications were firmly established, ASTM International published a usable standard.

In that case, builders did not allow the slab sufficient time for concrete moisture levels to equilibrate reach equilibrium moisture content according to relative humidity RH.

Is this acceptable or compromise the test?

When To Test Concrete To ASTM F2170?

I hope this helps. First, I have to state that Axtm is specified for interior applications that are under consistent ambient air controls. Does the finish roof product have specifications for testing the concrete deck? In celebration of the V2170 Year, we will be closing early at This site uses Akismet to reduce spam. Customer Service Contact Us Returns. Can you please let me know your recommendation on this?

The MVER is defined as the rate of water vapor emissions from the surface of concrete and is determined with the use of a desiccant material sealed to asmt slab surface for a specified time period, then measured. Some calibration restrictions may apply, so read the standard carefully to be sure your test equipment qualifies for the most recent standard.

  BAKTERI RHIZOBIUM SP PDF

10 Guidelines for ASTM F Compliance

Finally, for best results, the combination of ASTM Aatm non-destructive moisture content testing and F in-situ relative humidity testing allows for a more complete picture of the moisture conditions of the slab. General contractors must bear in mind two interactive processes when they are looking at construction schedules: And moisture can still be an issue at grade so concrete foundations must be designed to include proper moisture drainage.

Sub-grade water vapor can permeate even well-mixed and applied slabs.

Leave a Reply Cancel reply Your email address will not be published. With all areas of ASTM-compliant RH testing, precision is key and data integrity must also be the focus for each flooring professional. Once you find aztm the methodology they require to meet warranty, I would reach out to someone within RCI in your area to conduct the tests.

October 31, at Thanks for the question. Please login or create an account. Logically then, moisture levels at the bottom of a slab will read higher from those at the surface.

In this way, in situ measurement provides a composite picture of overall slab moisture levels, and provides the data necessary to make business decisions regarding flooring installations.

Leave a Reply Cancel reply Your email address will not be published. RH Testing and Reporting Drill and prepare the test holes. Note that the liner requirements have been updated and the hole is to be fully lined to meet the ASTM standard. This site uses Akismet to reduce spam.

We also will not be shipping on these days, but will resume shipping on Tuesday, January 2nd. The first thing I would look at is the f270 that you are installing.

Now instead of putting things on hold for three full days while waiting for test results, contractors and flooring installers can take action in a day and be in full compliance with the F standard.